1 thought on “Seeking dry powder mortar production workshop rules and regulations”
Erica
Safety production management system
Catalog
. Construction organizational design and special safety construction plan compilation system . Safety technical measures plan implementation system three three , Safety Technical Interchange System Fourth, frame body, equipment installation and acceptance system 5. Construction machinery entry acceptance and maintenance and maintenance system , safety inspection system 7. Safety education Training System , Safety Production Award and Penalty System 9. Surgery accident system , sanitary cleaning system 11, fire prevention responsibility system Team safety activity system 13. Measures of not disturbing the people It fourteen, gatekeeper duty and defense system 15. Temporary electricity regular inspection system 16. Project “Three Treasures Four Four “Safety protection regulations 17. The management system at the project site 18. The production safety responsibility system of production workers 19. Construction site safety inspection system
. The compilation of construction organization design and special safety construction plan . The preparation of construction organization design is carried out by relevant personnel such as the company’s engineering department and unit engineering construction technology. . The review and approval of the construction organization design shall be approved by the person in charge of engineering and technical personnel. . Management content and requirements 1. Preparation of the significance and principles of construction organization design Construction organizational design is a comprehensive technology and economic document that guides construction preparation and organizational construction. The principles that must be implemented by the design organization design are: coordinated planning, scientifically organized construction, establishing normal production order, making full use of space, striving to shorten time, promoting advanced construction technology, formulating technical measures to ensure the quality and safety construction of the project, and use it. A small amount of manpower and financial resources have achieved excellent engineering quality and the best economic effect. 2. The depth and requirements of the construction organization design The construction organization design should generally prepare the general construction organization general design and unit engineering of different construction organizations according to the size, structural characteristics and technical simplification and construction conditions of the project. Construction organization design (or construction plan). (1) Construction projects and construction groups above the medium size shall prepare the general design of the construction organization: small projects and general engineering establishment construction organization design or construction schemes. (2) Large -scale reinforcement projects, important expansion, and reconstruction projects shall be compiled according to the project and simplify the design organization design. (3) The installation and mechanized construction of industrial equipment shall be prepared separately. (4) Large -scale demolition projects, and the demolition sub -project of the difficult structure must be prepared. 3. Preparation of basic requirements for construction organization design (1) Implement the implementation of basic construction procedures and construction procedures, and scientifically arrange construction in accordance with the spirit and planning requirements of the contract. (2) Implement the construction technical procedures, operate regulations, ensure the quality and production safety of the project, reduce the cost of engineering, increase the level of mechanization, and increase labor productivity. (3) Use scientific methods, organize three -dimensional cross, parallel flow operation, and use network technology to determine the best construction organization solution. (4) Implement seasonal construction measures to ensure continuous construction throughout the year. (5) Try to use the formal engineering, site, original building, and the nearby facilities to reduce the amount of project volume set up on -site temporary facilities. (6) According to the actual conditions, the comprehensive balance of manpower and material resources, organize balanced construction, try to use local resources to reduce the amount of material transportation and save energy. (7) Carefully arrange the overall planning of construction, save construction land, strive not to occupy, take less land, and do a good job of civilized construction. 4. The authority of the construction organization design. The construction organization design preparation, review and approval, unit engineering construction organization design is compiled by the person in charge of engineering construction technology, and the company’s technical person in charge is reviewed and approved. 5. Construction organizational design document distribution and management. The construction organizational design or construction schemes are in six copies. One of the heads of the engineering department, department, materials and equipment department, project manager, and engineering construction technology is each, and another company archives. The person in charge of the construction technology of the project is the executor of the construction organization design. When arranging the inspection construction plan, the construction activities must be strictly implemented in accordance with the design and deployment.
. The implementation system of safety technical measures It various technical measures taken to create good labor conditions in order to prevent work injury and explosion accidents. 1. Engineering and technical personnel who participated in the preparation, review, and approve safety technical measures to deal with the construction technical responsibilities of the safety and technical measures compiled, reviewed, and approved, according to the division of engineering projects, compile them step by step, report to the approval step by step, and submit it step by step, and report to the approval step by step. After approval and approval of safety technical measures (together with the construction organization design and construction plan), the company’s technical department reported to the company’s technical person in charge for approval, and the Ministry of Engineering was filed. The engineering department shall not issue production plans or engineering projects without safety technical measures. 2. Each project department shall propose a safety technical measure plan for the next year in November each year. 3. Safety technical measures must be prepared according to the characteristics of the project, the construction season and construction conditions. It must be targeted, which can truly play a role in guiding safety protection and ensuring safe production. 4. Safety technical measures in the construction plan of the branch (sub -item) project. The project department organizes engineering and technical personnel to be compiled, and the project manager is responsible for review. 5. The safety technical measures in the unit engineering construction plan shall be compiled by the company’s engineering department, approved by the technical person in charge, approved by the company manager, and will be recorded by the quality security department. 6. In the technical design of self -made large tools (including lifting tools), safety technical measures for production and use must be proposed at the same time. The person in charge of the technology is approved and the manager approves. 7. Safety and technical measures will be reviewed by the Ministry of Engineering of the Company’s Ministry of Engineering. The financial department will be unified and balanced. After being approved by the supervisory manager, it will be included in the plan. The source of funds shall be handled in accordance with national regulations. 8. Safety technical measures are responsible for inspection and assessment by the person in charge of technical, engineering, and quality and safety. While checking the safety production of the construction site, the implementation of the safety technical measures of the project is inspected. If the safety technical measures or safety measures that are not prepared according to this standard are found, the economic punishment will be imposed in accordance with the award and penalty regulations formulated by the company.
. Safety technology base system . Safety technical intercourse must be performed at the same time as the construction task is issued. The type of work can be regularly bottomed out. The types of work of non -fixed operating venues are regularly submitted to different operating parts and different operating contents. . The content of security technology should include the safety protection facilities, safety operation procedures, safety precautions, etc. of the workplace, which must be targeted and simple. . The class leader’s daily class before the class will make targeted written security configuration according to the construction tasks and characteristics of the day, and there must be written records. . The new entry team must go to the security technical intercourse before entering the job.
. Fourth, the installation and acceptance system of the shelf, equipment installation and acceptance 1. Various materials that constitute the frame. The observation certificate issued by the supervision and management department, etc., is strictly prohibited from using unlicensed products. 2. After the construction equipment is installed, the project department is inspected by the project department. 3. All personnel of all settings, inspections, and acceptance responsibilities shall be signed and approved on the acceptance form. In the acceptance form, various inspection items should have conclusions and data quantification. 4. The shelf and equipment should be checked once a regular basis, and the relevant departments and personnel are participated; the daily inspection is performed by the operating driver before the class, and it can be put into use when confirming it. 5. For inspection, the problems found during the acceptance should be rectified, and the measures shall be rectified and recorded in the case. 6. There should be a variety of accurate certificates and qualification certificates in the acceptance data, the equipment trial operation records, and the electrical equipment has resistance test records. Disassembling permit “, operator” Zhejiang Tower crane installation and disassembly certificate “and their ID card.
. Construction machinery entry acceptance and maintenance and maintenance system 1. The construction machinery of the entrance must have a manufacturer’s production license, a certificate of qualification permit or a local construction safety supervision department. Otherwise, it is not allowed to enter the venue. 2. After the construction machine is installed, it must be accepted by the enterprise safety management department. It can be used after passing it. The acceptance records are done. The acceptance personnel perform the signing procedures. 3. Daily inspection: Every time the mechanical equipment runs, it must be checked one by one, which is mainly performed by the operator. It can be combined with daily maintenance. If a large problem is found, it should be reported immediately to organize repair in time. 4. Regular inspections: Professional maintenance workers are responsible for operating workers to participate in the inspection, and comprehensively check the performance and actual wear of the equipment according to the time specified to determine the repair time and the type of repair. 5. For the repair of construction machinery, the construction team can be established by the on -site construction team. It is fully responsible for the maintenance of the machinery and equipment of each construction site. The technical complicated large repair work is responsible for the professional machine repair department. 6. Each check and repair should be recorded, and the inspection or maintenance personnel signed.
. Safety inspection system 1. The company organizes regular and irregular safety in accordance with the “Safety Inspection Standards for Construction Construction” (JGJ59-99) The construction project department is at least once in half a day, and the team is not less than once a week. For special construction projects, the implementation of safety measures such as chimneys, water towers, beams, foundations, large concretes, and prefabricated components can be carried out in depth on the spot inspection. 2. Various safety inspections can be recorded at a time. The hidden dangers of the found accidents should be fixed, timed, and measured, and comprehensive rectification of funds should be implemented. 3. Construction workers and safety officers should review the results of the rectification. If it is difficult to rectify for a while, a rectification notice will be issued, rectification and review within a time limit. 4. The relevant information of the inspection results and rectification should be archived in time.
7. Safety education and training system In order to further increase the safety awareness of project workers, improve safety skills, master safety operation technical specifications, improve workers’ self -protection awareness, prevent all kinds of casualties When it happened, each project department formulated a safety education and training system in accordance with the following principles: 1. Strictly implement the relevant provisions of the national and municipal special operators, organize the training of special operators in a timely manner, and to the security department or the competent authority Report the situation; conscientiously implement the national and municipal regulations on labor protection, as well as the labor protection benefits of relevant personnel, and supervise the implementation of the implementation; . The project department establishes a third -level security education file: Education, replacement of new types of work, and using new technologies, new processes, new equipment, new materials, safety education and safety training, assessment and certificate issuance of special industry personnel. Establish a third -level security education card for the safety education card of the site, and the basic knowledge, safety discipline and operating procedures for new entrants must carry out safety construction. The first -level safety education shall conduct labor protection of the newly -included personnel by the Engineering Department. Safety production regulations, policies, policies, safety regulations, safety discipline and compliance education, the cumulative time is 15 school hours. The second -level safety education is responsible for the project department, conducts on -site safety knowledge of the staff, and conducts safety rules and regulations, high -altitude operations, on -site safety use, accident reports, labor disciplinary education in combination with construction nature. Time. It -level safety education is responsible for the team. Education content is on -site safety precautions, safety technical operating procedures, mechanical and equipment used in the work, the performance of the tools, and the correct use of personal protective supplies, the correct use of personal protective supplies, and the correct use of personal protective supplies, and the correct use of personal protective supplies. The cumulative time is 20 hours. The employee’s “three” safety education is passed after passing the assessment; the assessment content is listed as one of the workers and rating content, and the test papers are attached; . Special work training: Telector, welders, crane machinery operators, tower crane drivers, and elevated operators are conducted by the training center (or training course) for professional security education and operation skills training. Issue a certificate and hold the certificate. Those who have unlicensed duties shall be fined in accordance with the regulations on the production and punishment of production safety; 4. When using new construction (production) methods, new equipment, and new materials, each project department shall organize formulation of new safety measures and new safety operation methods. And new job safety knowledge education. 5. The replacement of new types of work must be carried out on -site safety precautions, safety technical operation procedures, and education for the performance of mechanical equipment and equipment used in the work. 6. This system is implemented by the project department.
8. Safety production award and punishment system In order to implement the implementation of safety production evaluation standards for the implementation department, work hard to work hard, and ensure the safety of employees’ personal and collective property. , Eliminate major casualties. The system for on -site safety production awards and penalties. . Reward The reference to the company’s second OO annual reward method for the quality of the project to win high -quality awards. . Penalties 1. Before starting, the construction site must submit to the company to design a safety organization design and certificate resume and documents. Pure fines. In order to strengthen the safety of construction sites, the construction site must be equipped with full -time personnel. If it is found that there is no full -time security staff or a full -time security personnel, a fine of 100 yuan will be imposed. The project department must adjust the security officer in half a month. If the project department cannot regulate a full -time security staff, the company should apply to the company. Essence The special types of work at the construction site must hold a certificate. If the lack of a licenseer or a licensee is not in place, a fine of 500 yuan is imposed. At the same time, the construction site must try to select personnel to be sent to the relevant unit for training within half a month. After the training is completed, the construction site will be increased by 500 yuan except for the training fee. 2. The construction site must unconditionally obey the company’s leadership and supervision of safety work and accept the company’s guidance. If the construction site is poorly implemented, the monthly safety inspection of the company is evaluated as a safe and unqualified construction site. Except for rectification according to the company’s opinions, it is fined 0.50 yuan per square meter according to the unit engineering construction area. People buy ingredients for safety equipment rectification to meet the qualified standards. Except for the construction site, it is responsible for the construction site, and a fine of 1.00 yuan per square meter according to the unit engineering construction area. 3. Usually the company’s staff at the construction site for work. A fine of 200 yuan to 1,000 yuan. Among them: The foundation of the rod of scaffolding: the pitch of the vertical rod, the small horizontal pole spacing, the spacing of the large crossbar, the closure of the pole, the knot knot, the protective railing, the foot of the foot, the scaffolding material, the acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance. If the Shangren and other do not meet the safety regulations, they shall be fined 50 to 100 yuan. The construction power: electrical equipment, departure line distance support, on -site lighting, low -voltage trunk settings, changing power distribution devices, switching boxes, leakage security device (adopted three -level protection), fuse wires, etc. For the regulations, a fine of 20 yuan to 50 yuan. “Four Port” protection: If there is a protective facility such as the stairs, the reserved hole, the passage, and the balcony mouth, a fine of 20 yuan to 50 yuan shall be imposed. Tower crane: torque limiter, limited position, lightning protection, insurance device, roadbed and rail rails, tower cranes and transmission line distances, transmission acceptance of rail clamps, cables, etc. 50 yuan fine. This, well -character racks, limited insurance, cable wind rope, unloading platform, hanging basket operation shed, lightning protection, acceptance, etc., which do not meet the safety regulations, shall be fined 20 to 50 yuan. Construction machinery: flat planing, chainsaw, handheld electric tool, steel machine mechanical welding machine, mixing machine, acetylene generator, gas cylinder, submersible pump and other fines that do not meet the safety requirements of 30 to 50 yuan Essence 4. The local security department inspections and evaluation safety unqualified construction sites. In addition to the rectification of the provincial, municipal, and district departments during the time limit, it will be fined 2 yuan per square meter by unit engineering construction area. 5. Insurance accidents, in addition to reporting to the company in accordance with regulations, make the following regulations. If concealment is not reported, double punishment. The causes of casualties in the construction site to find out the cause of the cause of the construction site. If the construction site violates the regulations, it is required that the workers are required to take risks or the safety facilities of the construction site. It is necessary to investigate the responsibility of the leadership, and the criminal sanctions shall be performed in accordance with relevant regulations. The causes of the casualties of construction sites are found to be caused by workers’ illegal operations. 6. Before the construction of the construction site, the company sent safety to conduct three -level safety education for all employees. In the future, new workers will report to the company to conduct third -level safety education supplementary classes. If a worker who is found to be under -level safety education is discovered, one person is fined 50 yuan. 7. Safety convergence must be performed before each process work, and records must be made. If you find that you participate in the homework without the confrontation, a fine of 10 yuan per person. 8. The use of “Three Treasures” must hang the safety network in accordance with regulations. For example, the construction site does not hang the security net at the street or the sidewalk channel, punish 1,000 yuan, and take measures to protect it. High -altitude operations are tied to a seat belt according to regulations. If it is found that it is not tied to a seat belt, it will be fined 50 yuan per person. There is a seat belt in the construction site. If the workers are not discouraged, the fine is responsible. If the on -site operator finds a fine of 10 yuan per person who does not wear a helmet or wearing a vest and slippers. 9. The construction site must be hung and one picture. If one is found, a fine is 300 yuan. 10. Safety technical information must be complete, and it must be targeted. It is found that the safety data must be incomplete and a fine of 100 yuan is missing. 11. The provisions of the above clauses are directly charged to the construction site.
. Nine. Society of casualties accident 1. Regular reporting systems and records of work injury accidents at the construction site, establishing an accident file, filling in the casualties report every month, no casualties, no need to fill in the instructions without explanation instructions The casualties report is recognized by the company’s security management department. 2. The company should be reported immediately. First of all, organize strength to rescue the wounded and protect the scene. Classification of accidents) (investigation and analysis procedures for casualties of enterprise employees) investigations and registration, analysis, and statistics. 3. The accident shall be found in accordance with the “Regulations on the Investigation and Department of Investigations and Investigations of Employees in Zhejiang Province”, to find out the facts and responsibilities of the accident. Those who determine the direct responsibility, those who are responsible and leading responsible shall be dealt with in accordance with laws, regulations and policies. 4. The principle of adhering to the “three noses” decentralization of the accident (the cause of the reason can not be analyzed, the person and the employee of the accident responsible and the employee cannot be released, and the measures to prevent similar accidents are not let go) Correct safety management through investigation, analysis, and processing.
. The sanitary cleaning system 1. The site of the living area must be a hard floor, there is a drainage ditch, and the drainage is smooth. 2. Set up the washing pond. Dormitory on the second floor should have a water supply, water bucket and water falling pipe settings. 3. Set up domestic garbage tanks, tea pavilions, lock on the upper cover, and some people are responsible for the supply of garbage and tea. 4. The dormitory is bright and ventilated, the items are stacked neatly, the interior is cleaned, the person with a health leader and the turns on daily sweeping system to keep the room tidy. 5. Arrange full -time sanitary cleaning personnel, responsible for cleaning public venues, and maintaining the cleanliness and hygiene of the living environment. 6. Prepare the four harm facilities for disinfection to eliminate mosquito flies. 7. The office should be kept clean. The stationery should be neatly placed to make the window clear, without flies, no mouse. 8. The cafeteria should be used to prevent dust, flooding, mouse prevention, and stay away from the source of pollution. The inside and outside the cafeteria must be cleaned and cleaned every day and keep the internal and external environment.
11. Fire fire prevention responsibility system 1. On -site use of bright fire, there must be approval procedures and fire supervisors. 2. The building should be equipped with fire protection facilities per floor. The high -rise buildings should be used as a fire water source pipeline with floors. It is equipped with sufficient fire extinguishers. The placement is correct and reliable. 3. The welding cutting operation must strictly implement the three -level fire approval system. It is strictly forbidden to violate the fire. It is necessary to hold a certificate (welders operation certificate fire certificate) to clearly monitor the fire and prepare fire extinguishing equipment to ensure construction safety. 4. The paint room, woodworking sheds and dangerous goods warehouses, such as flammable and explosive places such as flammable and explosives, and prescribed fire -fire areas are strictly prohibited. 5. Non -electrician is strictly forbidden to install electrical appliances without authorization. 6. It is forbidden to use non -productive electric heating and kerosene stoves without authorization. 7. The fire equipment must not be used for it. It is not allowed to pile up around, and keep the road unobstructed.
This, the safety activity system of the team 1. Safety production is the first target of the day. Starting from this goal, everyone must know the importance of safe production. . The team leader should conduct safety technical intercourse before the work of the day to explain the safety operating procedures and precautions. . The safety production environment around the operation should be checked, and the problems should be rectified immediately. . The correct use of the safety protective supplies and other unsafe behaviors of the operator should be checked, and the problems are found to correct or stop entering the construction site in time. . The safety status of labor use tools, materials, electrical, and equipment should be checked. 6. Summary and evaluation before get off work, laid off after class, and carry out safety review activities every month.
3. Methods not disturbing the people In order to ensure the living environment and ecological environment of construction sites and nearby residents, promote the normal operation of the project, and formulate the following measures to disturb the people. 1. Comply with national laws and regulations on labor and environmental protection, and effectively control dust, noise, fixed waste, mud, strong light and other environmental pollution and harm. 2. Dust -proof measures should be formulated at the construction site to achieve the purpose of reducing or eliminating dust. In particular, the construction of a dense area and residential areas, the landscape tour area, the nursing area, and the state -stipulated cultural relics reserved areas, the construction site shall formulate a sprinkler and dust reduction system. 3. Promote civilized construction at the construction site, minimize the artificial loud noise, and enhance the conscious consciousness of the noise to prevent noise in the construction personnel. 4. Anyone who conducts strong noise operations in a dense area of the residents, strictly control the operation time, and the operation of the evening does not exceed 22, and the morning homework is not as early as 6. Try to take anti -noise measures, take the work of the surrounding people in advance, and report to the district and county environmental protection bureau where the construction site is located before the construction. 5. Strengthen the long -term monitoring of environmental noise at the construction site. Those who exceed the standard of the “Noise Limitation of the Construction Field” must adjust the relevant factors of the noise at the construction site in a timely manner to achieve the purpose of the construction noise and not disturbing the people. 6. Burning toxic and harmful substances at the construction site.
If 14. The gatekeeper duty and defense system In order to maintain social security, strengthen the management of the security work at the construction site, protect the national property and the personal safety of employees, and establish a security system and a defense system. 1. The construction site should be established at the construction site and the patrol protection field and handover system. 2. Non -construction personnel and staff on the construction site shall not enter the construction site casually. Foreigners contact the business or find someone. The guard must first verify the documents and enters the construction site after registration. 3. The materials of the construction site must be registered with the staff on duty, indicating the material specifications, varieties, quantities, the type and car number of the car. 4. Foreign transport materials must be signed by the person in charge of the unit project before the guards can be released. 5. Once a month will conduct a security education for employees, hold a guarantee meeting once a quarter, organize a regular security inspection, and store the rectification records in the internal information for inspection. 6. Flammable and explosive items on the construction site must have a strict management system, and set up special libraries and special personnel to provide storage, make good finished products, and formulate specific measures to prevent theft, destruction and public security disaster accidents. Essence 7. Various cases and disaster accidents occurred at the construction site. It is necessary to report and protect the site immediately, and cooperate with the public security organs to detect. 8. The gatekeeper on duty shall not leave the post casually.
. The regular inspection system for temporary electricity usage In order to conscientiously implement the policy of “safety first, prevention -oriented”, ensure the smooth progress of production, and prevent the occurrence of electric shock accidents. Temporary inspection system at the construction site: 1 1. Incorporate electricity to check the use of the lines and electrical equipment before going to work a day, and find the problems in a timely manner. Without a month, check and repair all the distribution boxes, the switch box, and record the inspection and maintenance situation. 2. The project manager is responsible for the construction site. Organize safety officers, technicians, and electricians to conduct comprehensive inspections on electricity consumption equipment at the construction site, and write the inspection and resolution into materials to record. . The Ministry of Quality and Security of the company conducts a comprehensive inspection of the temporary electricity usage situation on the scene every month. When the problems are found, the personnel, timing, growth, and measures are rectified, and rectification is re -inspected. . The inspection content is inspected in accordance with the relevant content of the “Technical Specifications for the Construction Site” JG46-88 and the relevant content of the national engineering construction (construction safety) promulgated by the Ministry of Construction in 1988.
If 16. The safety protection regulations of the project “Sanbao Four Port” The protection at the construction site shall be carefully implemented in accordance with the requirements (JGJ59-99). R n 1. You must wear a helmet at the construction site and tie a good hat buckle. 2. When setting up high -altitude or high -altitude operations such as manhole and scaffolding, the operator must tie a seat belt. 3. Temporary protection of balcony, floor, roof, etc. must be tightly protected, and it is not less than the two protective bargers or hanging safety nets. . The staircase steps and the platform must have a solid temporary protection bar. The elevator well estate must set a safety protection deletion or a fully closed enclosure with a height of not less than 1.2 meters. 5. Reserved the protection of the hole and the pit well. There must be a strict protective cover. The opening of the hole above 1.5m2 must be set up. The dual -road protection railings must be set up around, the entrance is hung with a safe flat net, and a warning sign is set. 6. The aisle entrance should be equipped with a protective grid, a grid width than the channel, the grid top scaffolding, and the high -rise building passage protection grid top must be provided with double -layer scooter (staggered set). 7. It is strictly forbidden to use damaged, lack of hard hats and mildew, and hard and crisp seat belts (safety nets).
17. The management system of the settlement of the project site . The construction site management team’s hand -clearing work is the basis for the appearance of the project engineering workshop Effective measures for work efficiency and reduction of costs. You must start the team, grasp the management of the team, and conduct regular evaluations in accordance with the operation of various team operations and linked to the award and punishment. On the basis of improving the operation quality of the team, each team consciously operates in accordance with their respective management standards in accordance with their respective management standards Hands down to ensure the improvement of the management level of the field capacity. . The project management leadership team shall be responsible for the implementation, inspection, and assessment of the work. The technicians, safety officers, and construction workers are responsible for implementing specific inspections and assessments. In principle, whoever issues tasks and assessments is generally responsible for the construction workers. The scoring meets the standards, does not make falsification, the deduction department indicates the reason, the values are focused, and the rewards and penalties must be clear. . The general requirements of the work of settlement at the construction site: 1. The construction team must clean up and land on the ground while construction. Reinforcement, brick, wood, wood, buckle, etc. are cleaned in time, and the construction waste that cannot be used cannot be used to the specified point. 2. Floor, roads, buildings are required to achieve no scattered concrete, mortar, broken bricks and other debris. Building waste is concentrated, and those who can use them should be used to use it on the spot. 3. The hand -overdrocated vehicle, tool vehicle, equipment, turnover materials, large templates, etc. used by the team’s team, washed the shovel in a timely manner to store them in time, and pay attention to keeping. 4. The construction team of the scaffolding operation must be cleared in time after the operation is completed. 5. The most basic requirement for the work of the hand is: “After the work is finished,”
18. The production safety responsibility system for production workers 1. Workers do a good job of safety work in this position, abide by various safety regulations, do not violate regulations, and persuade others Illegal operation. 2. To be familiar with the technical operating procedures of this type of work. In operation, you should adhere to your post and prohibit the operation after drinking. 3. Strengthen equipment maintenance, keep the workplace neatly clean, do a good job of civilized production, and properly use and properly protect various protective supplies and operation tools. 4. Carefully operate according to the requirements of the process. Various production records should be correct, clear, reliable, analyzed and judged correctly, and discover abnormal processing in time. 5. Machinery and equipment operators should conduct equipment inspections before work. It is strictly forbidden to operate with illness. Electrician must check on -site electricity before work every day. 6. Instructions to refuse illegal operations.
. The safety inspection system of construction site
. The production team must conduct safety technical configuration before work every day, and make a timely record of the team’s safety activities. The bottom must be targeted at the bottom. Sexual content; 2. Construction workers and safety officers must conduct daily safety inspections on the work surface every day. The problems found during the inspection should take rectification measures in time to implement the executive and rectification period; 3 3 , The project engineering department organizes relevant personnel to conduct safety inspections every week, and the security officers will make the account in a timely manner; 4. Inspection must be focused, pay attention to practical results, and establish a written notice of project rectification, and rectification feedback files System; 5. The project must set up a special person in charge of safety management and relevant records. If the larger hidden dangers cannot be rectified in time in the short term, emergency measures should be taken Or the behavior of individuals’ violation of safety operation procedures and systems should be stopped in time, and with corresponding rewards and penalties
Safety production management system
Catalog
. Construction organizational design and special safety construction plan compilation system
. Safety technical measures plan implementation system
three three , Safety Technical Interchange System
Fourth, frame body, equipment installation and acceptance system
5. Construction machinery entry acceptance and maintenance and maintenance system
, safety inspection system
7. Safety education Training System
, Safety Production Award and Penalty System
9. Surgery accident system
, sanitary cleaning system
11, fire prevention responsibility system Team safety activity system
13. Measures of not disturbing the people
It fourteen, gatekeeper duty and defense system
15. Temporary electricity regular inspection system
16. Project “Three Treasures Four Four “Safety protection regulations
17. The management system at the project site
18. The production safety responsibility system of production workers
19. Construction site safety inspection system
. The compilation of construction organization design and special safety construction plan
. The preparation of construction organization design is carried out by relevant personnel such as the company’s engineering department and unit engineering construction technology.
. The review and approval of the construction organization design shall be approved by the person in charge of engineering and technical personnel.
. Management content and requirements
1. Preparation of the significance and principles of construction organization design
Construction organizational design is a comprehensive technology and economic document that guides construction preparation and organizational construction. The principles that must be implemented by the design organization design are: coordinated planning, scientifically organized construction, establishing normal production order, making full use of space, striving to shorten time, promoting advanced construction technology, formulating technical measures to ensure the quality and safety construction of the project, and use it. A small amount of manpower and financial resources have achieved excellent engineering quality and the best economic effect.
2. The depth and requirements of the construction organization design
The construction organization design should generally prepare the general construction organization general design and unit engineering of different construction organizations according to the size, structural characteristics and technical simplification and construction conditions of the project. Construction organization design (or construction plan).
(1) Construction projects and construction groups above the medium size shall prepare the general design of the construction organization: small projects and general engineering establishment construction organization design or construction schemes.
(2) Large -scale reinforcement projects, important expansion, and reconstruction projects shall be compiled according to the project and simplify the design organization design.
(3) The installation and mechanized construction of industrial equipment shall be prepared separately.
(4) Large -scale demolition projects, and the demolition sub -project of the difficult structure must be prepared.
3. Preparation of basic requirements for construction organization design
(1) Implement the implementation of basic construction procedures and construction procedures, and scientifically arrange construction in accordance with the spirit and planning requirements of the contract.
(2) Implement the construction technical procedures, operate regulations, ensure the quality and production safety of the project, reduce the cost of engineering, increase the level of mechanization, and increase labor productivity.
(3) Use scientific methods, organize three -dimensional cross, parallel flow operation, and use network technology to determine the best construction organization solution.
(4) Implement seasonal construction measures to ensure continuous construction throughout the year.
(5) Try to use the formal engineering, site, original building, and the nearby facilities to reduce the amount of project volume set up on -site temporary facilities.
(6) According to the actual conditions, the comprehensive balance of manpower and material resources, organize balanced construction, try to use local resources to reduce the amount of material transportation and save energy.
(7) Carefully arrange the overall planning of construction, save construction land, strive not to occupy, take less land, and do a good job of civilized construction.
4. The authority of the construction organization design.
The construction organization design preparation, review and approval, unit engineering construction organization design is compiled by the person in charge of engineering construction technology, and the company’s technical person in charge is reviewed and approved.
5. Construction organizational design document distribution and management.
The construction organizational design or construction schemes are in six copies. One of the heads of the engineering department, department, materials and equipment department, project manager, and engineering construction technology is each, and another company archives.
The person in charge of the construction technology of the project is the executor of the construction organization design. When arranging the inspection construction plan, the construction activities must be strictly implemented in accordance with the design and deployment.
. The implementation system of safety technical measures
It various technical measures taken to create good labor conditions in order to prevent work injury and explosion accidents.
1. Engineering and technical personnel who participated in the preparation, review, and approve safety technical measures to deal with the construction technical responsibilities of the safety and technical measures compiled, reviewed, and approved, according to the division of engineering projects, compile them step by step, report to the approval step by step, and submit it step by step, and report to the approval step by step. After approval and approval of safety technical measures (together with the construction organization design and construction plan), the company’s technical department reported to the company’s technical person in charge for approval, and the Ministry of Engineering was filed. The engineering department shall not issue production plans or engineering projects without safety technical measures.
2. Each project department shall propose a safety technical measure plan for the next year in November each year.
3. Safety technical measures must be prepared according to the characteristics of the project, the construction season and construction conditions. It must be targeted, which can truly play a role in guiding safety protection and ensuring safe production.
4. Safety technical measures in the construction plan of the branch (sub -item) project. The project department organizes engineering and technical personnel to be compiled, and the project manager is responsible for review.
5. The safety technical measures in the unit engineering construction plan shall be compiled by the company’s engineering department, approved by the technical person in charge, approved by the company manager, and will be recorded by the quality security department.
6. In the technical design of self -made large tools (including lifting tools), safety technical measures for production and use must be proposed at the same time. The person in charge of the technology is approved and the manager approves.
7. Safety and technical measures will be reviewed by the Ministry of Engineering of the Company’s Ministry of Engineering. The financial department will be unified and balanced. After being approved by the supervisory manager, it will be included in the plan. The source of funds shall be handled in accordance with national regulations.
8. Safety technical measures are responsible for inspection and assessment by the person in charge of technical, engineering, and quality and safety. While checking the safety production of the construction site, the implementation of the safety technical measures of the project is inspected. If the safety technical measures or safety measures that are not prepared according to this standard are found, the economic punishment will be imposed in accordance with the award and penalty regulations formulated by the company.
. Safety technology base system
. Safety technical intercourse must be performed at the same time as the construction task is issued. The type of work can be regularly bottomed out. The types of work of non -fixed operating venues are regularly submitted to different operating parts and different operating contents.
. The content of security technology should include the safety protection facilities, safety operation procedures, safety precautions, etc. of the workplace, which must be targeted and simple.
. The class leader’s daily class before the class will make targeted written security configuration according to the construction tasks and characteristics of the day, and there must be written records.
. The new entry team must go to the security technical intercourse before entering the job.
. Fourth, the installation and acceptance system of the shelf, equipment installation and acceptance
1. Various materials that constitute the frame. The observation certificate issued by the supervision and management department, etc., is strictly prohibited from using unlicensed products.
2. After the construction equipment is installed, the project department is inspected by the project department.
3. All personnel of all settings, inspections, and acceptance responsibilities shall be signed and approved on the acceptance form. In the acceptance form, various inspection items should have conclusions and data quantification.
4. The shelf and equipment should be checked once a regular basis, and the relevant departments and personnel are participated; the daily inspection is performed by the operating driver before the class, and it can be put into use when confirming it.
5. For inspection, the problems found during the acceptance should be rectified, and the measures shall be rectified and recorded in the case.
6. There should be a variety of accurate certificates and qualification certificates in the acceptance data, the equipment trial operation records, and the electrical equipment has resistance test records. Disassembling permit “, operator” Zhejiang Tower crane installation and disassembly certificate “and their ID card.
. Construction machinery entry acceptance and maintenance and maintenance system
1. The construction machinery of the entrance must have a manufacturer’s production license, a certificate of qualification permit or a local construction safety supervision department. Otherwise, it is not allowed to enter the venue.
2. After the construction machine is installed, it must be accepted by the enterprise safety management department. It can be used after passing it. The acceptance records are done. The acceptance personnel perform the signing procedures.
3. Daily inspection: Every time the mechanical equipment runs, it must be checked one by one, which is mainly performed by the operator. It can be combined with daily maintenance. If a large problem is found, it should be reported immediately to organize repair in time.
4. Regular inspections: Professional maintenance workers are responsible for operating workers to participate in the inspection, and comprehensively check the performance and actual wear of the equipment according to the time specified to determine the repair time and the type of repair.
5. For the repair of construction machinery, the construction team can be established by the on -site construction team. It is fully responsible for the maintenance of the machinery and equipment of each construction site. The technical complicated large repair work is responsible for the professional machine repair department.
6. Each check and repair should be recorded, and the inspection or maintenance personnel signed.
. Safety inspection system
1. The company organizes regular and irregular safety in accordance with the “Safety Inspection Standards for Construction Construction” (JGJ59-99) The construction project department is at least once in half a day, and the team is not less than once a week. For special construction projects, the implementation of safety measures such as chimneys, water towers, beams, foundations, large concretes, and prefabricated components can be carried out in depth on the spot inspection.
2. Various safety inspections can be recorded at a time. The hidden dangers of the found accidents should be fixed, timed, and measured, and comprehensive rectification of funds should be implemented.
3. Construction workers and safety officers should review the results of the rectification. If it is difficult to rectify for a while, a rectification notice will be issued, rectification and review within a time limit.
4. The relevant information of the inspection results and rectification should be archived in time.
7. Safety education and training system
In order to further increase the safety awareness of project workers, improve safety skills, master safety operation technical specifications, improve workers’ self -protection awareness, prevent all kinds of casualties When it happened, each project department formulated a safety education and training system in accordance with the following principles:
1. Strictly implement the relevant provisions of the national and municipal special operators, organize the training of special operators in a timely manner, and to the security department or the competent authority Report the situation; conscientiously implement the national and municipal regulations on labor protection, as well as the labor protection benefits of relevant personnel, and supervise the implementation of the implementation;
. The project department establishes a third -level security education file:
Education, replacement of new types of work, and using new technologies, new processes, new equipment, new materials, safety education and safety training, assessment and certificate issuance of special industry personnel. Establish a third -level security education card for the safety education card of the site, and the basic knowledge, safety discipline and operating procedures for new entrants must carry out safety construction.
The first -level safety education shall conduct labor protection of the newly -included personnel by the Engineering Department. Safety production regulations, policies, policies, safety regulations, safety discipline and compliance education, the cumulative time is 15 school hours.
The second -level safety education is responsible for the project department, conducts on -site safety knowledge of the staff, and conducts safety rules and regulations, high -altitude operations, on -site safety use, accident reports, labor disciplinary education in combination with construction nature. Time.
It -level safety education is responsible for the team. Education content is on -site safety precautions, safety technical operating procedures, mechanical and equipment used in the work, the performance of the tools, and the correct use of personal protective supplies, the correct use of personal protective supplies, and the correct use of personal protective supplies, and the correct use of personal protective supplies. The cumulative time is 20 hours.
The employee’s “three” safety education is passed after passing the assessment; the assessment content is listed as one of the workers and rating content, and the test papers are attached;
. Special work training:
Telector, welders, crane machinery operators, tower crane drivers, and elevated operators are conducted by the training center (or training course) for professional security education and operation skills training. Issue a certificate and hold the certificate. Those who have unlicensed duties shall be fined in accordance with the regulations on the production and punishment of production safety;
4. When using new construction (production) methods, new equipment, and new materials, each project department shall organize formulation of new safety measures and new safety operation methods. And new job safety knowledge education.
5. The replacement of new types of work must be carried out on -site safety precautions, safety technical operation procedures, and education for the performance of mechanical equipment and equipment used in the work.
6. This system is implemented by the project department.
8. Safety production award and punishment system
In order to implement the implementation of safety production evaluation standards for the implementation department, work hard to work hard, and ensure the safety of employees’ personal and collective property. , Eliminate major casualties. The system for on -site safety production awards and penalties.
. Reward
The reference to the company’s second OO annual reward method for the quality of the project to win high -quality awards.
. Penalties
1. Before starting, the construction site must submit to the company to design a safety organization design and certificate resume and documents. Pure fines.
In order to strengthen the safety of construction sites, the construction site must be equipped with full -time personnel. If it is found that there is no full -time security staff or a full -time security personnel, a fine of 100 yuan will be imposed. The project department must adjust the security officer in half a month. If the project department cannot regulate a full -time security staff, the company should apply to the company. Essence
The special types of work at the construction site must hold a certificate. If the lack of a licenseer or a licensee is not in place, a fine of 500 yuan is imposed. At the same time, the construction site must try to select personnel to be sent to the relevant unit for training within half a month. After the training is completed, the construction site will be increased by 500 yuan except for the training fee.
2. The construction site must unconditionally obey the company’s leadership and supervision of safety work and accept the company’s guidance. If the construction site is poorly implemented, the monthly safety inspection of the company is evaluated as a safe and unqualified construction site. Except for rectification according to the company’s opinions, it is fined 0.50 yuan per square meter according to the unit engineering construction area. People buy ingredients for safety equipment rectification to meet the qualified standards. Except for the construction site, it is responsible for the construction site, and a fine of 1.00 yuan per square meter according to the unit engineering construction area.
3. Usually the company’s staff at the construction site for work. A fine of 200 yuan to 1,000 yuan. Among them:
The foundation of the rod of scaffolding: the pitch of the vertical rod, the small horizontal pole spacing, the spacing of the large crossbar, the closure of the pole, the knot knot, the protective railing, the foot of the foot, the scaffolding material, the acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance, acceptance. If the Shangren and other do not meet the safety regulations, they shall be fined 50 to 100 yuan.
The construction power: electrical equipment, departure line distance support, on -site lighting, low -voltage trunk settings, changing power distribution devices, switching boxes, leakage security device (adopted three -level protection), fuse wires, etc. For the regulations, a fine of 20 yuan to 50 yuan.
“Four Port” protection: If there is a protective facility such as the stairs, the reserved hole, the passage, and the balcony mouth, a fine of 20 yuan to 50 yuan shall be imposed.
Tower crane: torque limiter, limited position, lightning protection, insurance device, roadbed and rail rails, tower cranes and transmission line distances, transmission acceptance of rail clamps, cables, etc. 50 yuan fine.
This, well -character racks, limited insurance, cable wind rope, unloading platform, hanging basket operation shed, lightning protection, acceptance, etc., which do not meet the safety regulations, shall be fined 20 to 50 yuan.
Construction machinery: flat planing, chainsaw, handheld electric tool, steel machine mechanical welding machine, mixing machine, acetylene generator, gas cylinder, submersible pump and other fines that do not meet the safety requirements of 30 to 50 yuan Essence
4. The local security department inspections and evaluation safety unqualified construction sites. In addition to the rectification of the provincial, municipal, and district departments during the time limit, it will be fined 2 yuan per square meter by unit engineering construction area.
5. Insurance accidents, in addition to reporting to the company in accordance with regulations, make the following regulations. If concealment is not reported, double punishment.
The causes of casualties in the construction site to find out the cause of the cause of the construction site. If the construction site violates the regulations, it is required that the workers are required to take risks or the safety facilities of the construction site. It is necessary to investigate the responsibility of the leadership, and the criminal sanctions shall be performed in accordance with relevant regulations.
The causes of the casualties of construction sites are found to be caused by workers’ illegal operations.
6. Before the construction of the construction site, the company sent safety to conduct three -level safety education for all employees. In the future, new workers will report to the company to conduct third -level safety education supplementary classes. If a worker who is found to be under -level safety education is discovered, one person is fined 50 yuan.
7. Safety convergence must be performed before each process work, and records must be made. If you find that you participate in the homework without the confrontation, a fine of 10 yuan per person.
8. The use of “Three Treasures” must hang the safety network in accordance with regulations. For example, the construction site does not hang the security net at the street or the sidewalk channel, punish 1,000 yuan, and take measures to protect it. High -altitude operations are tied to a seat belt according to regulations. If it is found that it is not tied to a seat belt, it will be fined 50 yuan per person. There is a seat belt in the construction site. If the workers are not discouraged, the fine is responsible. If the on -site operator finds a fine of 10 yuan per person who does not wear a helmet or wearing a vest and slippers.
9. The construction site must be hung and one picture. If one is found, a fine is 300 yuan.
10. Safety technical information must be complete, and it must be targeted. It is found that the safety data must be incomplete and a fine of 100 yuan is missing.
11. The provisions of the above clauses are directly charged to the construction site.
. Nine. Society of casualties accident
1. Regular reporting systems and records of work injury accidents at the construction site, establishing an accident file, filling in the casualties report every month, no casualties, no need to fill in the instructions without explanation instructions The casualties report is recognized by the company’s security management department.
2. The company should be reported immediately. First of all, organize strength to rescue the wounded and protect the scene. Classification of accidents) (investigation and analysis procedures for casualties of enterprise employees) investigations and registration, analysis, and statistics.
3. The accident shall be found in accordance with the “Regulations on the Investigation and Department of Investigations and Investigations of Employees in Zhejiang Province”, to find out the facts and responsibilities of the accident. Those who determine the direct responsibility, those who are responsible and leading responsible shall be dealt with in accordance with laws, regulations and policies.
4. The principle of adhering to the “three noses” decentralization of the accident (the cause of the reason can not be analyzed, the person and the employee of the accident responsible and the employee cannot be released, and the measures to prevent similar accidents are not let go) Correct safety management through investigation, analysis, and processing.
. The sanitary cleaning system
1. The site of the living area must be a hard floor, there is a drainage ditch, and the drainage is smooth.
2. Set up the washing pond. Dormitory on the second floor should have a water supply, water bucket and water falling pipe settings.
3. Set up domestic garbage tanks, tea pavilions, lock on the upper cover, and some people are responsible for the supply of garbage and tea.
4. The dormitory is bright and ventilated, the items are stacked neatly, the interior is cleaned, the person with a health leader and the turns on daily sweeping system to keep the room tidy.
5. Arrange full -time sanitary cleaning personnel, responsible for cleaning public venues, and maintaining the cleanliness and hygiene of the living environment.
6. Prepare the four harm facilities for disinfection to eliminate mosquito flies.
7. The office should be kept clean. The stationery should be neatly placed to make the window clear, without flies, no mouse.
8. The cafeteria should be used to prevent dust, flooding, mouse prevention, and stay away from the source of pollution. The inside and outside the cafeteria must be cleaned and cleaned every day and keep the internal and external environment.
11. Fire fire prevention responsibility system
1. On -site use of bright fire, there must be approval procedures and fire supervisors.
2. The building should be equipped with fire protection facilities per floor. The high -rise buildings should be used as a fire water source pipeline with floors. It is equipped with sufficient fire extinguishers. The placement is correct and reliable.
3. The welding cutting operation must strictly implement the three -level fire approval system. It is strictly forbidden to violate the fire. It is necessary to hold a certificate (welders operation certificate fire certificate) to clearly monitor the fire and prepare fire extinguishing equipment to ensure construction safety.
4. The paint room, woodworking sheds and dangerous goods warehouses, such as flammable and explosive places such as flammable and explosives, and prescribed fire -fire areas are strictly prohibited.
5. Non -electrician is strictly forbidden to install electrical appliances without authorization.
6. It is forbidden to use non -productive electric heating and kerosene stoves without authorization.
7. The fire equipment must not be used for it. It is not allowed to pile up around, and keep the road unobstructed.
This, the safety activity system of the team
1. Safety production is the first target of the day. Starting from this goal, everyone must know the importance of safe production.
. The team leader should conduct safety technical intercourse before the work of the day to explain the safety operating procedures and precautions.
. The safety production environment around the operation should be checked, and the problems should be rectified immediately.
. The correct use of the safety protective supplies and other unsafe behaviors of the operator should be checked, and the problems are found to correct or stop entering the construction site in time.
. The safety status of labor use tools, materials, electrical, and equipment should be checked.
6. Summary and evaluation before get off work, laid off after class, and carry out safety review activities every month.
3. Methods not disturbing the people
In order to ensure the living environment and ecological environment of construction sites and nearby residents, promote the normal operation of the project, and formulate the following measures to disturb the people.
1. Comply with national laws and regulations on labor and environmental protection, and effectively control dust, noise, fixed waste, mud, strong light and other environmental pollution and harm.
2. Dust -proof measures should be formulated at the construction site to achieve the purpose of reducing or eliminating dust. In particular, the construction of a dense area and residential areas, the landscape tour area, the nursing area, and the state -stipulated cultural relics reserved areas, the construction site shall formulate a sprinkler and dust reduction system.
3. Promote civilized construction at the construction site, minimize the artificial loud noise, and enhance the conscious consciousness of the noise to prevent noise in the construction personnel.
4. Anyone who conducts strong noise operations in a dense area of the residents, strictly control the operation time, and the operation of the evening does not exceed 22, and the morning homework is not as early as 6. Try to take anti -noise measures, take the work of the surrounding people in advance, and report to the district and county environmental protection bureau where the construction site is located before the construction.
5. Strengthen the long -term monitoring of environmental noise at the construction site. Those who exceed the standard of the “Noise Limitation of the Construction Field” must adjust the relevant factors of the noise at the construction site in a timely manner to achieve the purpose of the construction noise and not disturbing the people.
6. Burning toxic and harmful substances at the construction site.
If 14. The gatekeeper duty and defense system
In order to maintain social security, strengthen the management of the security work at the construction site, protect the national property and the personal safety of employees, and establish a security system and a defense system.
1. The construction site should be established at the construction site and the patrol protection field and handover system.
2. Non -construction personnel and staff on the construction site shall not enter the construction site casually. Foreigners contact the business or find someone. The guard must first verify the documents and enters the construction site after registration.
3. The materials of the construction site must be registered with the staff on duty, indicating the material specifications, varieties, quantities, the type and car number of the car.
4. Foreign transport materials must be signed by the person in charge of the unit project before the guards can be released.
5. Once a month will conduct a security education for employees, hold a guarantee meeting once a quarter, organize a regular security inspection, and store the rectification records in the internal information for inspection.
6. Flammable and explosive items on the construction site must have a strict management system, and set up special libraries and special personnel to provide storage, make good finished products, and formulate specific measures to prevent theft, destruction and public security disaster accidents. Essence
7. Various cases and disaster accidents occurred at the construction site. It is necessary to report and protect the site immediately, and cooperate with the public security organs to detect.
8. The gatekeeper on duty shall not leave the post casually.
. The regular inspection system for temporary electricity usage
In order to conscientiously implement the policy of “safety first, prevention -oriented”, ensure the smooth progress of production, and prevent the occurrence of electric shock accidents. Temporary inspection system at the construction site:
1 1. Incorporate electricity to check the use of the lines and electrical equipment before going to work a day, and find the problems in a timely manner. Without a month, check and repair all the distribution boxes, the switch box, and record the inspection and maintenance situation.
2. The project manager is responsible for the construction site. Organize safety officers, technicians, and electricians to conduct comprehensive inspections on electricity consumption equipment at the construction site, and write the inspection and resolution into materials to record.
. The Ministry of Quality and Security of the company conducts a comprehensive inspection of the temporary electricity usage situation on the scene every month. When the problems are found, the personnel, timing, growth, and measures are rectified, and rectification is re -inspected.
. The inspection content is inspected in accordance with the relevant content of the “Technical Specifications for the Construction Site” JG46-88 and the relevant content of the national engineering construction (construction safety) promulgated by the Ministry of Construction in 1988.
If 16. The safety protection regulations of the project “Sanbao Four Port”
The protection at the construction site shall be carefully implemented in accordance with the requirements (JGJ59-99). R n 1. You must wear a helmet at the construction site and tie a good hat buckle.
2. When setting up high -altitude or high -altitude operations such as manhole and scaffolding, the operator must tie a seat belt.
3. Temporary protection of balcony, floor, roof, etc. must be tightly protected, and it is not less than the two protective bargers or hanging safety nets.
. The staircase steps and the platform must have a solid temporary protection bar. The elevator well estate must set a safety protection deletion or a fully closed enclosure with a height of not less than 1.2 meters.
5. Reserved the protection of the hole and the pit well. There must be a strict protective cover. The opening of the hole above 1.5m2 must be set up. The dual -road protection railings must be set up around, the entrance is hung with a safe flat net, and a warning sign is set.
6. The aisle entrance should be equipped with a protective grid, a grid width than the channel, the grid top scaffolding, and the high -rise building passage protection grid top must be provided with double -layer scooter (staggered set).
7. It is strictly forbidden to use damaged, lack of hard hats and mildew, and hard and crisp seat belts (safety nets).
17. The management system of the settlement of the project site
. The construction site management team’s hand -clearing work is the basis for the appearance of the project engineering workshop Effective measures for work efficiency and reduction of costs. You must start the team, grasp the management of the team, and conduct regular evaluations in accordance with the operation of various team operations and linked to the award and punishment. On the basis of improving the operation quality of the team, each team consciously operates in accordance with their respective management standards in accordance with their respective management standards Hands down to ensure the improvement of the management level of the field capacity.
. The project management leadership team shall be responsible for the implementation, inspection, and assessment of the work. The technicians, safety officers, and construction workers are responsible for implementing specific inspections and assessments. In principle, whoever issues tasks and assessments is generally responsible for the construction workers. The scoring meets the standards, does not make falsification, the deduction department indicates the reason, the values are focused, and the rewards and penalties must be clear.
. The general requirements of the work of settlement at the construction site:
1. The construction team must clean up and land on the ground while construction. Reinforcement, brick, wood, wood, buckle, etc. are cleaned in time, and the construction waste that cannot be used cannot be used to the specified point.
2. Floor, roads, buildings are required to achieve no scattered concrete, mortar, broken bricks and other debris. Building waste is concentrated, and those who can use them should be used to use it on the spot.
3. The hand -overdrocated vehicle, tool vehicle, equipment, turnover materials, large templates, etc. used by the team’s team, washed the shovel in a timely manner to store them in time, and pay attention to keeping.
4. The construction team of the scaffolding operation must be cleared in time after the operation is completed.
5. The most basic requirement for the work of the hand is: “After the work is finished,”
18. The production safety responsibility system for production workers
1. Workers do a good job of safety work in this position, abide by various safety regulations, do not violate regulations, and persuade others Illegal operation.
2. To be familiar with the technical operating procedures of this type of work. In operation, you should adhere to your post and prohibit the operation after drinking.
3. Strengthen equipment maintenance, keep the workplace neatly clean, do a good job of civilized production, and properly use and properly protect various protective supplies and operation tools.
4. Carefully operate according to the requirements of the process. Various production records should be correct, clear, reliable, analyzed and judged correctly, and discover abnormal processing in time.
5. Machinery and equipment operators should conduct equipment inspections before work. It is strictly forbidden to operate with illness. Electrician must check on -site electricity before work every day.
6. Instructions to refuse illegal operations.
. The safety inspection system of construction site
. The production team must conduct safety technical configuration before work every day, and make a timely record of the team’s safety activities. The bottom must be targeted at the bottom. Sexual content;
2. Construction workers and safety officers must conduct daily safety inspections on the work surface every day. The problems found during the inspection should take rectification measures in time to implement the executive and rectification period;
3 3 , The project engineering department organizes relevant personnel to conduct safety inspections every week, and the security officers will make the account in a timely manner;
4. Inspection must be focused, pay attention to practical results, and establish a written notice of project rectification, and rectification feedback files System;
5. The project must set up a special person in charge of safety management and relevant records. If the larger hidden dangers cannot be rectified in time in the short term, emergency measures should be taken Or the behavior of individuals’ violation of safety operation procedures and systems should be stopped in time, and with corresponding rewards and penalties